Special Temporary Authority application - Applicant Name
Name of Applicant:
QUALCOMM Incorporated
Special Temporary Authority application - Best Contact
First Name:
John
Last Name:
Forrester
Phone Number:
8588457428
Title:
Principal Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2012-08-30 00:00:00.0
Signature of Applicant (Authorized person filing form):
John Forrester
Title of Applicant (if any):
Principal engineer
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
Qualcomm is filing this request as an extension of STA 0035-EX-ST-2012 / Call sign WF9XKM to conduct limited testing within the 14.0 to 14.5 GHz frequency band. The extension is required to complete the initial testing and also support some new tests required based on collected data. Qualcomm is filing this request as an extension of STA 0035-EX-ST-2012 / Call sign WF9XKM to conduct limited testing within the 14.0 to 14.5 GHz frequency band. The extension is required to complete the initial testing and also support some new tests required based on collected data. Qualcomm has used the experimental authority for signal propagation measurements to verify the expected performance for its proposed Next-Gen Air-Ground system. Additional time is required to further prove-in the validity of our signal propagation measurements and interference calculations. This information will be used to address questions submitted to the FCC with respect to Qualcomm?s Petition for. Changes from 0035-EX-ST-2012 include: 1) Extend authorization period 2) Increased available azimuth for all sites. Azimuth used for testing is coordinated with WAFC prior to transmission on approved dates.
Special Temporary Authority application - Information
Callsign:
WF9XKM
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Explanation
Please explain in the area below why an STA is necessary:
Qualcomm is filing this request as an extension of STA 0035-EX-ST-2012 / Call sign WF9XKM to conduct limited testing within the 14.0 to 14.5 GHz frequency band. The extension is required to complete the initial testing and also support some new tests required based on collected data. Qualcomm will use the experimental authority to conduct tests that will allow it to characterize the Next Gen Air-Ground System antenna performance using a singled fixed transmitter on the ground and measuring RX power in an aircraft. Changes from 0035-EX-ST-2012 include: 1) Extend authorization period 2) Increased available azimuth for all sites. Azimuth used for testing is coordinated with WAFC prior to transmission on approved dates.
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
To conduct tests that will allow to characterize the Next Gen Air-Ground System antenna performance . Please see operational description attachment
Special Temporary Authority application - Initial values - Requested Period of Operation
Operation Start Date:
08/30/2012
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
Qualcomm
Equipment 1 Model Number
Prototype
Equipment 1 No. Of Units
2
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
To conduct tests that will allow to characterize the Next Gen Air-Ground System antenna performance. Please see operational description attachment