Special Temporary Authority application - Applicant Name
Name of Applicant:
QUALCOMM Incorporated
Special Temporary Authority application - Best Contact
First Name:
John
Last Name:
Forrester
Phone Number:
8588457428
Title:
Principal Engineer
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2012-04-11 00:00:00.0
Signature of Applicant (Authorized person filing form):
John Forrester
Title of Applicant (if any):
Principal Engineer
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
Please explain in the area below why an STA is necessary: This STA is an extension of callsign WF9XMB (file 0090-EX-ST-201) as additional testing is required at additional locations. Testing will occur only at limited times within the granted period of time. Transmitters are disabled when testing is not in process. Qualcomm is completing propagation testing in support of developing next generation wireless technologies and advanced receivers. This testing is not related to any Ku-band or air-ground networks. The data is to be part of a propagation study for future receiver designs operating near these frequencies (not necessarily these exact bands) and not a test of a specific system/technology.
Special Temporary Authority application - Information
Callsign:
WF9XPY
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Next generation wireless technologies and advanced receivers. A single fixed transmitter will be configured per the requested frequencies. Receive power will be measured in the immediate area of the fixed transmitter. The transmitter is fixed and the receiver is mobile. The receiver is a spectrum analyzer on a wheeled cart that is moved to various locations near the transmitter to measure received RF power.
Special Temporary Authority application - Initial values - Requested Period of Operation
Operation Start Date:
04/15/2012
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
Yes
Equipment 1 Manufacturer
Qualcomm
Equipment 1 Model Number
Prototype
Equipment 1 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
Next generation wireless technologies and advanced receivers. Next generation wireless technologies and advanced receivers. A single fixed transmitter will be configured per the requested frequencies. Receive power will be measured in the immediate area of the fixed transmitter. The transmitter is fixed and the receiver is mobile. The receiver is a spectrum analyzer on a wheeled cart that is moved to various locations near the transmitter to measure received RF power.
Special Temporary Authority application - Requested Period of Operation