Attachment Schedule S GXT

This document pretains to SAT-MOD-20080523-00113 for Modification on a Satellite Space Stations filing.

IBFS_SATMOD2008052300113_643940

                        EXHIBIT 2J Back—Up Telemetry Transmit Beam
                                              Pipe Antenna
                                     (Schedule S Beam ID TLMP)

                                    Polarization: Left Hand Circular—
                                      Peak Antenna Gain: 5.3 dBi
                                          Peak EIRP: 11.6 dBW


                                  Azimuth Cut Antenna Gain Pattern




                                                  .%




Notes:
1) Gain variation in azimuth shown for elevation angle of 0°.
2) The x—axis represents the azimuth angle and spans from —180° to +180°. Each major axis division line
   represents 20° of azimuth.
3) The y—axis represents the antenna gain. Each major axis division line represents 2 dB of gain.




                                               Page 24 of 28



Document Created: 2019-04-28 17:34:55
Document Modified: 2019-04-28 17:34:55

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC