Experimental Licensing System

0595-EX-ST-2010

Morehead State University

Experimental Licensing System filing 0595-EX-ST-2010 submitted by Morehead State University.

Filing overview

StatusDenied/Dismissed
Call signWE9XNM
Date filed2010-12-21
Status date2011-01-12
FCC sourceView the FCC filing record

Special Temporary Authority application - Address

Attention:
Dr. Benjamin K. Malphrus (Space Science Center)
City:
Morehead
E-Mail Address:
b.malphrus@moreheadstate.edu
State:
KY
Street Address:
200 A. B. Chandler Place
Zip Code:
40351

Special Temporary Authority application - Applicant Name

Name of Applicant:
Morehead State University

Special Temporary Authority application - Best Contact

First Name:
Ronald
Last Name:
Schulze
Phone Number:
443-778-4924
Title:
Mini-RF RF Systems Lead

Special Temporary Authority application - Certification

Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2010-12-21 00:00:00.0
Signature of Applicant (Authorized person filing form):
Ron Schulze
Title of Applicant (if any):
Mini-RF Calibration System Engineer

Special Temporary Authority application - Explanation

Please explain in the area below why an STA is necessary:
The Morehead ground station is being used to characterize the Mini-RF radar instrument, one of seven instruments on NASAs Lunar Reconnaissance Orbiter (LRO). LRO is currently orbiting the Moon. The science team has a program requirement to characterize the transmit and receive paths of the Mini-RF instrument on a regular basis. The characterizations require one week of testing and repeated every 9-12 months.

Special Temporary Authority application - Information

Callsign:
WE9XNM
Class of Station:
FX
Nature of Service:
Experimental

Special Temporary Authority application - Initial values - Requested Period of Operation

Operation End Date:
12/31/2011
Operation Start Date:
09/13/2010

Special Temporary Authority application - Manufacturer

Equipment 1 Experimental
No
Equipment 1 Manufacturer
Microhard
Equipment 1 Model Number
MHX 2400
Equipment 1 No. Of Units
1
Equipment 2 Experimental
Yes
Equipment 2 Manufacturer
Northrup Grumman
Equipment 2 Model Number
EM Mini-RF Tx
Equipment 2 No. Of Units
1

Special Temporary Authority application - Purpose of Operation

Please explain the purpose of operation:
The Morehead ground station will be outfitted with hardware to uplink a pulsed CW tone (duty cycle 80%) and receive Mini-RF transmissions. The uplink pulse repetition inteval is approx 1.25 seconds and the transmit pulse width is approx 1 second. Mini-RF can transmit/receive RF signals between 2370 and 2390 MHz. We will select a CW tone to uplink over this band for our experiment. Tentatively, an uplink tone at 2379.5 MHz and downlink tone at 2380.5 MHz from Mini-RF is being planned. The uplink power (at the feed input) is expectred to be ~60 Watts. The exact timing of the test is difficult to schedule due to the complexities with scheduling time to use the LRO spacecraft and a requirement to coordinate the test around New Moon. The main constraint that we have on the ground is cold weather. With this in mind the test will be conducted sometime between Sept 1 and Dec 31, 2010.

Special Temporary Authority application - Requested Period of Operation

Operation End Date:
05/31/2011
Operation Start Date:
01/12/2011

Frequencies

ActionLower MHzUpper MHzClassOutput WERP WEmissionSignal
New2370.000000002390.00000000FX100.00000023000000.00000020K0L0N1.25 sec PRI, 1 sec PW
New2370.000000002390.00000000FX100.00000023000000.000000500KG2D110 kbps dev ratio 1.2 pk
New2417.200000002431.20000000FX1.000000168000.000000350KF1D86000 baud
New7130.000000007150.00000000FX100.000000100000000.00000020K0L0N1.25 PRI, 1 sec PW
New7130.000000007150.00000000FX100.000000100000000.000000500KG2D110 kbps dev ratio 1.2 pk

Sites

SiteLocationCoordinatesOperating areaCountyRadius
Morehead, KentuckyNorth 38 11 30 West 83 26 2016.20

Sources and provenance

SourceSource recordRetrievedMatch
ELS0595-EX-ST-20102026-07-30 08:57:11Source Primary
Selected field provenance
FieldDisplayed valueSourceObserved
StatusDenied/DismissedELS 0595-EX-ST-20102026-07-30 08:57:11
Applicant NameMorehead State UniversityELS 0595-EX-ST-20102026-07-30 08:57:11
Call SignWE9XNMELS 0595-EX-ST-20102026-07-30 08:57:11
Receipt Date2010-12-21ELS 0595-EX-ST-20102026-07-30 08:57:11
Status Date2011-01-12ELS 0595-EX-ST-20102026-07-30 08:57:11

Documents

DocumentTypeDateStatus
Dismissal Without Prejudice generated [Jan 12, 2011]Correspondence2011-01-20Available
Application clarificationText Documents2011-01-12Available
AFTRCC CoordinationText Documents2010-12-21Available