Special Temporary Authority application - Applicant Name
Name of Applicant:
Washington Laboratories, Ltd.
Special Temporary Authority application - Best Contact
First Name:
Brian
Last Name:
Dettling
Phone Number:
301-216-1500
Title:
Document
Special Temporary Authority application - Certification
Applicant certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Date:
2008-04-16 00:00:00.0
Signature of Applicant (Authorized person filing form):
Michael F. Violette
Title of Applicant (if any):
President
Special Temporary Authority application - Explanation
Please explain in the area below why an STA is necessary:
Hensel Phelps Construction is the prime contractor for the new DISA HQ building (Contract DoDI3222.03). The contract calls for unintentional emission control to be no greater than specified maximum levels, as required by NSA.
Special Temporary Authority application - Information
Class of Station:
FX
Nature of Service:
Experimental
Special Temporary Authority application - Initial values - Explanation
Please explain in the area below why an STA is necessary:
Objective: characterize the propagation over 100MHz to 10 GHz for a new installation
Special Temporary Authority application - Initial values - Manufacturer
Equipment 4 Manufacturer
EMCO
Equipment 4 Model Number
3146
Special Temporary Authority application - Initial values - Purpose of Operation
Please explain the purpose of operation:
Characterize immunity to operational disruption
Special Temporary Authority application - Manufacturer
Equipment 1 Experimental
No
Equipment 1 Manufacturer
Kalmus
Equipment 1 Model Number
757LCB-CE
Equipment 1 No. Of Units
1
Equipment 2 Experimental
No
Equipment 2 Manufacturer
EMCO
Equipment 2 Model Number
3141
Equipment 2 No. Of Units
1
Equipment 3 Experimental
No
Equipment 3 Manufacturer
EMCO
Equipment 3 Model Number
3146
Equipment 3 No. Of Units
1
Equipment 4 Experimental
No
Equipment 4 Manufacturer
ARA
Equipment 4 Model Number
DRG-118/A
Equipment 4 No. Of Units
1
Equipment 5 Experimental
No
Equipment 5 Manufacturer
MilMega
Equipment 5 Model Number
KM104-30B
Equipment 5 No. Of Units
1
Equipment 6 Experimental
No
Equipment 6 Manufacturer
MilMega
Equipment 6 Model Number
KM104-30B
Equipment 6 No. Of Units
1
Special Temporary Authority application - Purpose of Operation
Please explain the purpose of operation:
To perform site attenuation measurement to quantify signal loss through free space, originating at the proposed building construction site and measured at the NSA fence line. A pre-construction site survey is needed to determine shielding requirements of the new building.
Special Temporary Authority application - Requested Period of Operation